CIRCULAR LETTER
No. 02 / SE / M / 2010
In order to implement Article 78, Government Regulation Indonesia Number 34 of 2006 on the road, need determination guidelines road management regarding the planning and execution of construction suspension bridge for pedestrians with the following conditions:
- GENERAL, This Circular Letter issued to become a reference for planners and / or implementing the plan and / or carry out the construction of the bridge hanging for pedestrians. The purpose of this guideline is set to be a suspension bridge construction walkers can meet the necessary factors in the design, construction to maintenance. Enforcement of this Circular for Echelon I and Echelon II in the neighborhood Department of Public Works to be used properly, whereas for the Governors and Regents / Mayors throughout Indonesia in order to used as a reference as needed.
- MATERIAL CONTENT Guidelines for the planning and construction of a suspension bridge pedestrian load planning and execution, including maintenance superstructure, substructure and foundation for the suspension bridge pedestrian traffic with a maximum of 120 m main span. The following planning criteria that need to be considered to ensure pedestrian bridge is safe, namely:
- Strength,
- Deflection,
- The dynamic weight.
bridge. Things are done in periodic bridge maintenance is examination nuts to keep them clean and free of rust, inspection clamps mounting and painting of steel rod at least 1 (one) times in 3 (three years. Guidelines for the planning and construction of a suspension bridge pedestrian published in full in the Appendix, and is part integral with the Circular Letter of the Minister.
Signed by the Minister of Public Works of the Republic of Indonesia (Djoko Kirmanto)
Furthermore, you can fully know the contents of the Circular of the Minister of Public Works through this link : www.pu.go.id