Rural Road Construction

Rural Road Construction

In the context of equitable development , needs a good road and village road construction standards , it becomes very important to be able to support development in other areas , so the road construction would not only cater urban areas alone , but must also be built so that a representative rural roads development of economic sectors can be increased . For that , let us review some of the construction , and the standard model of Rural Roads Development Techniques Rural Road Construction
  1. Construction of a new road being built in the area of ​​Rural à pavement width between 2.5 to 3.0 m.
  2. construction type is determined by the amount or volume of traffic that passes through the body of that road . ( to complete , also refer to highway construction )
Path model consists of :
  • Roads compacted soil ( < 50 4-wheel vehicles per day )
  • The road is paved with pebbles / gravel ( 50-100 4-wheel vehicles per day )
  • The road is paved in Telford ( 50-100 4-wheel vehicles per day )
  • Roads with asphalt pavement ( 50-100 4-wheel vehicles per day )
  • Roads with concrete pavement ( 50-100 4-wheel vehicles per day ) .
It should be considered in the construction of new roads :
  • alignment easy way to make
  • Employment land is relatively fast and inexpensive
  • There are many additional buildings ( bridges , culverts , etc. )
  • Land acquisition is not difficult
  • Will not damage the environment and
It should be noted in the improvement of the existing road :
  • Allows doing road widening
  • The geometry of the road must be adapted to the technical requirements
  • Rise to be changed according to the standard , with attention to :
  • The drainage system and land a job does not damage the environment
Quality Mixed à 1 = standard concrete cement : 2 sand : 3 gravel Material Requirements :
  • Sand and gravel must be free of other materials such as clay , trash , and other debris .
  • Gravel must be hard with the field broken at least 3 fields
  • Construction 15 cm thick
  • Process pencampuan with water should not be too much .
The things that must be considered in the implementation of the concrete road work :
  1. The Land formed the basis of the back of the cow ' s
  2. Concrete sand spread and compacted thickness of 5 cm
  3. Mounted Mould Board to limit the thickness specified
  4. Mortar is poured onto the surface of the concrete and compacted by vibration
  5. Mounted Mould Board to limit the thickness specified
  6. Rough surface created using a broom stick to the side . Each 1 m behind making dilatation / water with wide straps and a 1 cm 2 cm to prevent cracking
  7. Consumption after the age of concrete at least 21 days counted from the end of the casting
  8. Surfaces should always be soaked for at least 7 days after the concrete hardens .
Technical standard rural roads that should be considered :
  • intersection
  • Bend on Steep Rise
  • Shape the Way Agency
  • The road surface
  • shoulders
  • Soil compaction
  • Climbing protection
  • Roadside Channels
  • Disposal of Channels and Culverts
  • Groundwater Drainage
  • Vegetative treatment
  • Soil stabilization
  • Road Construction In The muddy
Hopefully useful Rural Road Construction